Kolpino Power plant compressor station service works

GazSurf field engineers have successfully completed scheduled booster compressor station service works at TEC PGU GRS Energo (Saint-Petersburg, Kolpino).
The scope of works included supply and installation of spare parts and consumables.

Booster compressor station battery limits:
MSG-3 4R2MSGP-3RCG/30 booster centrifugal compressor (1 pcs.)
BAOSI minibooster (compressor for methane-nitrogen mix compression) (1 pcs.)
Instrument air and nitrogen station (1 pcs.)
Gardner Denver VS 45 screw compressor (1 pcs.)
Membrane air separation unit.