Sitemap
Menu
- About us
- Gas processing
- Concept engineering
- Design
- Equipment
- Articles
- GAS PROCESSING SIMPLYFIED
- GAS PROCESSING: GOOD MONEY ON WASTE
- GAS DEHYDRATION
- ASSOCIATED PETROLEUM GAS PROCESSING
- ADVANTAGES OF MODULAR APPROACH TO GAS PROCESSING
- "Turn key" in 18 months: complex gas treating plant in Kazakhstan
- NGL production out of associated petroleum gas
- Associated petroleum gas processing project experience
- Natural gas treating upstream of pipeline transportation
- Field gas treating unit with storage and transportation system
- Air Separation
- Projects
- Service
- Adler power station gas equipment technical maintenance
- Complex inspection of the compressor station for Irkutsk Oil Company
- Startup and commissioning of 17 compressor units "Kirishineftegasorgsynthez"
- "Keymir" gaslift compressor station startup and commissioning
- Minnibay GPP compressor equipment yearly technical maintenance
- Baikonur space launch site compressor equipment maintenance
- Ingersoll Rand compressors start up for "Kaszink"
- "Kaszink" air separation unit cryogenic pumps startup
- Kirishi Power plant compressor maintenance
- Cherepovets Power plant booster gas compressors technical maintenance
- Kamyshinsky glass factory compressor equipment maintenance
- Supervising service work of Ajax compressor units
- Cryostar S.A.S. cryogenic pump repair work
- Maintenance of compressors at the Minnibaevsky GPP
- Carrying out emergency repair of the booster compressor station of PJSC "TGC-1"
- Repair and restoration work of the booster compressor station of PJSC "TGC-1"
- installation supervision and commissioning of the compressor unit TA-3000 manufactured by Cameron
- Service
- News
- COMPRESSOR STATION STARTUP IS SERBIA
- "GAZSURF" AT WINTER OLYMPICS!
- HAZOP for PAO "YaTEC" complex associated gas treating station
- GazSurf came first in a bid competition for repair of compressor equipment at RN-Sakhalinmorneftegaz Odoptu Compressor station.
- "Associated petroleum gas - 2017" conference materials
- GazSurf at GPA Midstream Convention 2018
- GazSurf at international East Russia Oil and Gas Forum
- GazSurf obtained license to ProMax software
- GazSurf awarded sour gas dehydration unit
- GazSurf awarded the propane cooling unit for Gas processing plant
- Oxygen plant start-up at POX Hub provided by GazSurf
- GazSurf started production of a small-tonnage LNG plant with a capacity of 800 kg/h
- Custom hydrogen compression
- New stage of the project in Urikhtau
- "Gazsurf" completed the project for the supply of block-modular refrigeration unit
- "Grodno Azot" put into operation the ASU
- Project completion for "NOVATEK-Murmansk"
- "GazSurf" started shipment of ASU equipment for "Grodno Azot"
- GazSurf will supply a carbon dioxide storage and distribution station for NOVATEK-Murmansk
- GazSurf launched adsorption dehydration of balance gas at the Yaya Oil Refinery
- "GazSurf" launched an air separation unit for "Chelyabtekhgaz"
- "GazSurf" carried out maintenance of the ASU at the Baikonur Cosmodrome
- The engineering company GazSurf carried out timely development
- GazSurf signed an agreement with PJSC Tatneft for the supply of equipment for the Polymer Sulfur Production Unit
- GAZSURF HAS SIGNED A CONTRACT WITH TATNEFT TO SUPPLY EQUIPMENT FOR A PROJECT THAT WILL SIGNIFICANTLY REDUCE EMISSIONS OF HARMFUL GASES INTO THE ATMOSPHERE.
- KDO(N)-438Y(500Y) complete air separation unit for sale
- Contact us