Desulfurization unit capacity increase at Minnibaevskaya GPP

Location — Republic of Tatarstan
Facility — Minnibaevskaya GPP 
Capacity — from 50 to 65 thousand m3/hour
Scope of works — Design and detailed design documentation development, supply of equipment, installation, commissioning tests
Customer — PJSC “Tatneft”
Year — 2017

Performing a set of measures to modernize absorptive columns of gas desulfurization unit.
Column reduced resistance — from 0,5 to 0,15 kgf/cm², column capacity increase from 50 to 65 тыс. m³/hour., gas desulfurization — up to 10 ppm.