All Project
Project

Glycol dryer

Location — Perm
Capacity — 70,000 Nm3/h
Scope of works — Development, manufacture, supply of equipment, installation supervision and commissioning
Customer — Lukoil-Perm
Year — 2020

The purpose of the project was to install the dehydration of sulfur-containing gas before transportation to the GPP.

  • 70 000 Nm3/h max gas.
  • Dew point minus 200C and below