All news
News

New stage of the project in Urikhtau

In September 2021, the engineering company Gazsurf completed the supply of equipment of its own production to the Urikhtau field in Kazakhstan.

Specialists of the Gazsurf company developed and manufactured an associated petroleum gas drying unit in a block-modular design, and then delivered it to the customer's site in Kazakhstan. Now the project is at the stage of putting the equipment into operation.

10 декабря 2021

Helium extraction out of vented gas feasibility study at Tatneft cryogenic unit

Tatarstan

Kolesnikov metallurgical works air separation plant retrofit design

Norilsk

Booster compressor station АО "NIS - Gasprom Neft" in Serbia

Serbia

Installation supervision and commissioning of the compressor unit TA-3000 manufactured by Cameron

Samara region